Optimal Placement of Docking Stations and Resident AUVs for Subsea Pipeline Inspection
用于海底管道检查的对接站和驻留式 AUV 的最佳放置
Gabrielė Kasparavičiūtė、Pasquale Grippa、Kjetil Skaugset、Asgeir J. Sørensen、Martin Ludvigsen · arXiv:2607.19944 · 2026-07-22 · math.OC
为海底管道事件响应规划引入了两阶段混合整数线性规划框架,联合优化海底对接板(SDP)放置和常驻自主水下航行器分配,以最大限度地减少空间不确定性下的最大和平均响应时间。第 1 阶段最大限度地缩短所有潜在泄漏位置的最大响应时间。第 2 阶段根据最大限制减少平均响应时间。基于挪威 Johan Sverdrup 油气田的案例研究(有 9 个 SDP 选项和 33 条管道)表明,只需几个位置良好的 SDP 就足以实现最佳性能。成本
中文为机器翻译节选,以英文原文为准。
English abstract
A two-stage mixed-integer linear programming framework is introduced for subsea pipeline incident response planning, jointly optimizing Subsea Docking Plate (SDP) placement and resident autonomous underwater vehicle allocation to minimize both maximum and average response times under spatial uncertainty. Phase 1 minimizes the maximum response time across all potential leak locations. Phase 2 reduces the average response time subject to the maximum bound. A case study based on the Johan Sverdrup oil and gas field in Norway, with 9 SDP options and 33 pipelines, shows that just a few well-placed SDPs are enough to achieve top performance. A cost versus time Pareto analysis reveals the trade-off between deployment expenditure and response efficiency, providing actionable guidance for designing resilient and cost-effective subsea inspection networks.