Latent World Models with Monotone Planning Costs for Image-Goal Navigation

用于图像目标导航的具有单调规划成本的潜在世界模型

Amirhosein Chahe、Siwei Cai、Lifeng Zhou · arXiv:2608.09073 · 2026-08-10 · cs.RO

论文自动收录 · 未精读PDF ↗arXiv 原文 ↗
壹摘要

使用潜在世界模型进行图像目标导航不仅需要准确的未来预测,还需要可靠地对候选动作序列进行排名的规划成本。我们将成本定义为预测的未来嵌入与目标嵌入之间的余弦距离,并表明不良的成本排序可能会误导基于采样的规划者,例如交叉熵方法(CEM)。为了解决这个问题,我们提出了一个基于冻结的 DINO 系列编码器的潜在世界模型,并通过两个互补的目标对其进行训练。自回归推出损失减少了训练和多步骤计划推出之间的差距,而单调成本排名(MCR)损失

中文为机器翻译节选,以英文原文为准。

English abstract

Image-goal navigation with latent world models requires not only accurate future prediction, but also a planning cost that reliably ranks candidate action sequences. We define the cost as the cosine distance between the predicted future embedding and the goal embedding, and show that poor cost ordering can mislead sampling-based planners such as Cross-Entropy Method (CEM). To address this, we propose a latent world model built on a frozen DINO-family encoder and train it with two complementary objectives. An autoregressive rollout loss reduces the gap between training and multi-step planning rollouts, while a Monotone Cost Ranking (MCR) loss directly encourages increasingly perturbed action sequences to receive higher planning costs. We also study InfoNCE-based action-contrastive training and find that temporal permutation negatives distort the latent geometry and degrade planning…

贰引用
Amirhosein Chahe、Siwei Cai、Lifeng Zhou. Latent World Models with Monotone Planning Costs for Image-Goal Navigation. arXiv:2608.09073 (2026-08-10). https://arxiv.org/abs/2608.09073v2
叁同分类新篇