Eventually Optimal and Scalable Multi-Agent Planning for Block Cave Mining

最终最优且可扩展的块洞采矿多智能体规划

Christopher Leet、Paolo Forte、Uwe Köckemann、Henrik Andreasson、Sven Koenig · arXiv:2609.07109 · 2026-09-07 · cs.RO

论文自动收录 · 未精读PDF ↗arXiv 原文 ↗
壹摘要

地下采矿自动化有可能显着提高安全性、运营效率和可持续性。然而,在动态矿山环境中有效协调自动驾驶车队给优化和运动规划带来了巨大的挑战。为了解决这些挑战,我们引入并形式化了 \emph{Block Cave Mining (BCM)} 问题,该问题侧重于计算一个运输计划,在满足拉深比约束的同时最大化矿石吞吐量。为了解决这个问题,我们提出了 SAMM,一种最终最优的随时求解器,联合集成了任务分配、调度和路径

中文为机器翻译节选,以英文原文为准。

English abstract

Automation in underground mining has the potential to significantly enhance safety, operational efficiency, and sustainability. However, effectively coordinating fleets of autonomous vehicles in dynamic mine environments introduces substantial challenges in both optimization and motion planning. To address these challenges, we introduce and formalize the \emph{Block Cave Mining (BCM)} problem, which focuses on computing a transport plan that maximizes ore throughput while satisfying draw ratio constraints. To solve this problem, we propose SAMM, an eventually optimal anytime solver that jointly integrates task assignment, scheduling, and path planning via a mixed-integer linear programming formulation. To improve scalability, we also introduce SAMMS, a variant of SAMM that trades optimality guarantees for efficiency by decomposing the problem into shorter planning subcycles.…

贰引用
Christopher Leet、Paolo Forte、Uwe Köckemann 等 5 人. Eventually Optimal and Scalable Multi-Agent Planning for Block Cave Mining. arXiv:2609.07109 (2026-09-07). https://arxiv.org/abs/2609.07109v1
叁同分类新篇