Adapt for Planning, Not just Prediction: Optimistic Test-Time World Model Adaptation
适应规划,而不仅仅是预测:乐观的测试时世界模型适应
Akshay Mete、Dileep Kalathil、P. R. Kumar · arXiv:2610.35636 · 2026-10-26 · cs.LG
潜在世界模型通常是离线预训练的,并在测试时保持冻结状态,因此使用它们进行规划可能会在分布转移的情况下降级。测试时适应 (TTA) 可以通过在部署期间更新模型来缓解这种退化。与固定数据的预训练不同,用于规划的 TTA 是闭环的:规划器使用模型部署来选择操作,产生的转换驱动下一次更新。这就提出了一个问题:哪个目标应该指导 TTA 进行规划?在仅预测目标下,模型仅适合其自身行动的结果,因此它对于实现目标的行动可能仍然是错误的,
中文为机器翻译节选,以英文原文为准。
English abstract
Latent world models are typically pre-trained offline and kept frozen at test time, so planning with them can degrade under distribution shift. Test-time adaptation (TTA) can mitigate this degradation by updating the model during deployment. Unlike pre-training on fixed data, TTA for planning is closed-loop: the planner uses model rollouts to select actions, and the resulting transitions drive the next update. This raises the question: which objective should guide TTA for planning? Under a prediction-only objective, the model is fit only to the outcomes of its own actions, so it can remain wrong about the actions that would reach the goal, and low prediction error need not translate into better planning. Inspired by reward-biased maximum likelihood from adaptive control, we introduce Optimistic Test-Time Adaptation (OpTTA). Its objective has two terms, the prediction loss on observed…